Directional vehicle identification
The SXK-Y17 works with the SXK-AC05 active vehicle tag. It uses directional optical wake-up and reads the tag after it enters the reader's detection field.
Bluetooth Parking Reader
The SXK-Y17 works with the SXK-AC05 active vehicle tag. It uses directional optical wake-up and reads the tag after it enters the reader's detection field.
Installers and system integrators matching vehicle credentials to an existing access controller.
The SXK-Y17 works with the SXK-AC05 active vehicle tag. It uses directional optical wake-up and reads the tag after it enters the reader's detection field.
The datasheet lists relay, RS485 and Wiegand interfaces by version. Send the lane approach and your controller input so we can identify the correct reader version.
Directional optical wake-up defines where an SXK-AC05 tag becomes active. Aim the reader against the actual approach rather than choosing a mounting angle from distance alone.
Relay, RS485 and Wiegand connections vary by version. Match the reader output to the controller before ordering or replacing a reader.
Pair the SXK-Y17 reader with SXK-AC05 in-vehicle active tags for vehicle identification.
The SXK-AC05 is the active vehicle tag used with the SXK-Y17 parking reader. It wakes in the reader field before sending its identity.
The SXK-AC05 is the in-vehicle credential used by the SXK-Y17 system. Its identity is transmitted after wake-up in the reader field.
Send the existing SXK-Y17 reader and parking controller details. Confirm the credential requirements before adding tags for more vehicles.
These values apply to the tag; reader specifications are listed separately below.
A reader specification does not automatically apply to its paired tag. Read range and identification behaviour depend on the selected combination.
Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.
Send these details with your enquiry so we can review the equipment and configuration.
Details for equipment review and installation planning.
Technical reference: datasheet p. 2.
Review the supplied connection drawings. Select a drawing to enlarge the labels and terminals.
Match the equipment to the site, the users and the access workflow.
Confirm the installed controller and credential type before replacing a reader. Test the actual approach and mounting position.
Vehicle identification lane illustration; reader and tag models vary by project.Define the vehicle credential batch and access permissions. Check the reader and tag pairing before deployment.
Project planning exampleOrder by the complete reader or tag version. Record the interface, power arrangement and required accessories.
Project planning exampleProduct documents for your technical review.
Product functions, specifications and configuration scope.
Specifications for the matching SXK-AC05 active vehicle tag.
Questions about selection, integration and installation.
The SXK-Y17 works with the SXK-AC05 active vehicle tag. It uses directional optical wake-up and reads the tag after it enters the reader's detection field.
Pair the SXK-Y17 reader with SXK-AC05 in-vehicle active tags for vehicle identification. Reader and tag specifications are listed separately on this page.
Send the credential technology and existing reader or controller details. Compatibility must be checked against the exact version.
Read performance depends on the credential, mounting position and surrounding conditions. Test the proposed combination at the site.
Specify the exact model or variant, quantity, interface, supply and mounting requirements. For tags, include the matching reader and credential requirements.
The datasheet lists relay, RS485 and Wiegand interfaces by version. Send the lane approach and your controller input so we can identify the correct reader version.
We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.
Send the model, quantity and installation requirements. Include your layout or controller details where relevant.
Replies within 2 hours during Beijing business hours.