Stored energy for emergency opening
The SXK-AS01 uses a supercapacitor to store energy for a compatible 24 V DC barrier. It can support an emergency opening when the main supply fails.
Supercapacitor Backup Power
The SXK-AS01 uses a supercapacitor to store energy for a compatible 24 V DC barrier. It can support an emergency opening when the main supply fails.
Installers and equipment buyers matching local controls and backup equipment to barrier cabinets.
The SXK-AS01 uses a supercapacitor to store energy for a compatible 24 V DC barrier. It can support an emergency opening when the main supply fails.
Opening depends on the controller, the stored charge and the arm configuration. Send the gate model and power details so we can check the match.
The module stores energy for a compatible barrier opening. Confirm the controller and arm load against the available discharge conditions.
Charge the module and test a controlled loss of the normal supply. Confirm full opening, then restore power and verify recharge.
The module can retain stored energy after normal power is isolated. Follow the delivered wiring and discharge procedure before servicing; confirm compatibility with the controller and arm.
Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.
Send these details with your enquiry so we can review the equipment and configuration.
Details for equipment review and installation planning.
Technical reference: datasheet p. 2.
Review the supplied connection drawings. Select a drawing to enlarge the labels and terminals.
Match the equipment to the site, the users and the access workflow.
Define the commands an operator needs and the cable route. Check terminals and the compatible controller inputs.
Controlled parking entrance illustration; control and power components follow the project design.Review supply, mounting space and the required connection. Keep the installed module clear of moving components.
Project planning exampleIdentify the existing controller and wiring before ordering. Verify the complete system after replacing the component.
Project planning exampleProduct documents for your technical review.
Product functions, specifications and configuration scope.
Questions about selection, integration and installation.
The SXK-AS01 uses a supercapacitor to store energy for a compatible 24 V DC barrier. It can support an emergency opening when the main supply fails.
Send the barrier controller and wiring details. The module must match the required electrical and control interface.
Confirm the module, fittings and wiring scope with the order. Other lane equipment remains separately specified.
Check the intended command or backup function with the actual controller. Record the final settings and complete the system handover checks.
Opening depends on the controller, the stored charge and the arm configuration. Send the gate model and power details so we can check the match.
We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.
Send the model, quantity and installation requirements. Include your layout or controller details where relevant.
Replies within 2 hours during Beijing business hours.