One sensor per bay
The SXK-T02F mounts above the front of a marked parking space. It detects occupancy by ultrasound and shows the bay status on its integrated LED.
Ultrasonic Parking Sensor
The SXK-T02F mounts above the front of a marked parking space. It detects occupancy by ultrasound and shows the bay status on its integrated LED.
Parking installers and system integrators planning bay detection, controllers and vacancy displays.
The SXK-T02F mounts above the front of a marked parking space. It detects occupancy by ultrasound and shows the bay status on its integrated LED.
The sensor reports to a zone controller. Mark the bay positions and ceiling conditions on the plan so we can review the proposed mounting points.
The ultrasonic sensor and integrated LED share one mounting point. Check ceiling height, columns and pipework before fixing the location.
Assign the sensor address and bay association during commissioning. Test a parked vehicle and an empty space before accepting the displayed count.
The RJ45 sensor connectors carry the specified field interface. They are not Ethernet or standard PoE ports. Confirm the pin assignments, cable length and field power budget.
Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.
Supplied system topology reference. Confirm actual device counts, branches and power loading for the ordered configuration.
Send these details with your enquiry so we can review the equipment and configuration.
Details for equipment review and installation planning.
Technical reference: datasheet p. 4.
Match the equipment to the site, the users and the access workflow.
Mark the bays, mounting height and obstructions on the plan. Verify occupied and empty conditions after addressing the sensors.
Indoor parking guidance system illustration; sensor, controller and display configurations vary.Define the floors, zones and cable routes before selecting controller groups. Match signs to the approved network structure.
Project planning examplePlace signs before driver decision points. Associate each arrow or displayed count with the correct zone.
Project planning exampleProduct documents for your technical review.
Product functions, specifications and configuration scope.
Questions about selection, integration and installation.
The SXK-T02F mounts above the front of a marked parking space. It detects occupancy by ultrasound and shows the bay status on its integrated LED.
Quantities depend on bay count, field devices, cable routes and controller topology. Send the floor plan and proposed sign positions for review.
Review the downstream device counts, cabling and controller structure before expansion. The optional node layer is selected for the approved layout.
Assign device addresses, map sensors to bays and signs to zones. Verify occupied and vacant conditions, displayed counts and communication recovery.
The sensor reports to a zone controller. Mark the bay positions and ceiling conditions on the plan so we can review the proposed mounting points.
We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.
Send the model, quantity and installation requirements. Include your layout or controller details where relevant.
Replies within 2 hours during Beijing business hours.