SXK-T110 handheld sensor setup
This tool is for configuring ultrasonic bay sensors during installation and maintenance. The parking guidance documents describe Bluetooth communication with an Android handset and infrared transfer to the sensor.
Sensor Configuration Tool
This tool is for configuring ultrasonic bay sensors during installation and maintenance. The parking guidance documents describe Bluetooth communication with an Android handset and infrared transfer to the sensor.
Parking installers and system integrators planning bay detection, controllers and vacancy displays.
This tool is for configuring ultrasonic bay sensors during installation and maintenance. The parking guidance documents describe Bluetooth communication with an Android handset and infrared transfer to the sensor.
The tool is shared across the sensor installation. Send the sensor model and the system version so we can check the matching configuration tool.
Bluetooth connects the configuration tool to the Android handset application. An infrared link transfers the selected parameters to the sensor.
The tool is used during installation and maintenance rather than at every bay permanently. Confirm the sensor and application version before commissioning.
Shared system documentation covers several models. The values on this page refer to the named device; network distances depend on compliant cabling and the approved topology.
Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.
Supplied system topology reference. Confirm actual device counts, branches and power loading for the ordered configuration.
Send these details with your enquiry so we can review the equipment and configuration.
Details for equipment review and installation planning.
Technical reference: datasheet p. 5.
Match the equipment to the site, the users and the access workflow.
Mark the bays, mounting height and obstructions on the plan. Verify occupied and empty conditions after addressing the sensors.
Indoor parking guidance system illustration; sensor, controller and display configurations vary.Define the floors, zones and cable routes before selecting controller groups. Match signs to the approved network structure.
Project planning examplePlace signs before driver decision points. Associate each arrow or displayed count with the correct zone.
Project planning exampleProduct documents for your technical review.
Product functions, specifications and configuration scope.
Questions about selection, integration and installation.
This tool is for configuring ultrasonic bay sensors during installation and maintenance. The parking guidance documents describe Bluetooth communication with an Android handset and infrared transfer to the sensor.
Quantities depend on bay count, field devices, cable routes and controller topology. Send the floor plan and proposed sign positions for review.
Review the downstream device counts, cabling and controller structure before expansion. The optional node layer is selected for the approved layout.
Assign device addresses, map sensors to bays and signs to zones. Verify occupied and vacant conditions, displayed counts and communication recovery.
The tool is shared across the sensor installation. Send the sensor model and the system version so we can check the matching configuration tool.
We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.
Send the model, quantity and installation requirements. Include your layout or controller details where relevant.
Replies within 2 hours during Beijing business hours.