SXK-K02N

Node Controller

The SXK-K02N sits between groups of zone controllers and the central controller in larger layouts. It passes bay status upstream and guidance data back to the field network.

AC 110-240 VSupply voltage
2 CAN interfacesCommunication

Features & configuration.

Parking installers and system integrators planning bay detection, controllers and vacancy displays.

Optional network aggregation

The SXK-K02N sits between groups of zone controllers and the central controller in larger layouts. It passes bay status upstream and guidance data back to the field network.

Plan the controller groups

Identify the floors or zones that will share a network. We can review whether the proposed layout needs a node layer between its field devices and central control.

An optional aggregation layer

The node controller groups zone controllers in larger layouts. A node layer is selected for the approved network topology and is not required in every installation.

Transfer data in both directions

Bay status moves towards the central controller, while guidance data returns to the field network. Keep zone assignments consistent across both directions.

How it fits your project.

Shared system documentation covers several models. The values on this page refer to the named device; network distances depend on compliant cabling and the approved topology.

  1. Detect the bay status
  2. Collect data by zone
  3. Process the parking counts
  4. Update signs and the parking map

Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.

Supplied system topology reference. Confirm actual device counts, branches and power loading for the ordered configuration.

Confirm before installation.

Send these details with your enquiry so we can review the equipment and configuration.

  • Number of bays and floor plans
  • Ceiling conditions and mounting positions
  • Controller groups, power and cable routes
  • Sign direction, zone mapping and software connection

Specs.

Details for equipment review and installation planning.

Device & construction

Enclosure
Spray-coated galvanised steel sheet
Dimensions
320 × 260 × 90 mm
Net weight
2.74 kg

Operation & performance

Processor
32-bit ARM
CAN data rate
20 kbps
Downstream node capacity
Up to 25, subject to the approved network topology
Internal assembly
Power supply, control board, enclosure and circuit breaker

Interfaces & integration

Communication
2 CAN interfaces
Communication distance
≤1,000 m

Power & environment

Supply voltage
AC 110-240 V
Power consumption
≤2 W
Operating temperature
-30 to +75 °C
Operating humidity
≤90% RH, non-condensing

Technical reference: datasheet p. 7.

Applications.

Match the equipment to the site, the users and the access workflow.

Indoor parking bays

Mark the bays, mounting height and obstructions on the plan. Verify occupied and empty conditions after addressing the sensors.

Indoor parking guidance system illustration; sensor, controller and display configurations vary.

Multi-floor car parks

Define the floors, zones and cable routes before selecting controller groups. Match signs to the approved network structure.

Project planning example

Aisles and entrance signs

Place signs before driver decision points. Associate each arrow or displayed count with the correct zone.

Project planning example

Downloads.

Product documents for your technical review.

Before you order.

Questions about selection, integration and installation.

What is the SXK-K02N Node Controller used for?+

The SXK-K02N sits between groups of zone controllers and the central controller in larger layouts. It passes bay status upstream and guidance data back to the field network.

How many devices are needed?+

Quantities depend on bay count, field devices, cable routes and controller topology. Send the floor plan and proposed sign positions for review.

Can we add another floor or zone?+

Review the downstream device counts, cabling and controller structure before expansion. The optional node layer is selected for the approved layout.

What is checked during commissioning?+

Assign device addresses, map sensors to bays and signs to zones. Verify occupied and vacant conditions, displayed counts and communication recovery.

What should I confirm before ordering SXK-K02N?+

Identify the floors or zones that will share a network. We can review whether the proposed layout needs a node layer between its field devices and central control.

How can you help with installation?+

We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.

Related equipment.

Let’s review your configuration.

Send the model, quantity and installation requirements. Include your layout or controller details where relevant.

Replies within 2 hours during Beijing business hours.

Chat on WhatsApp