SXK-PGLED03

Three-Direction Display

The SXK-PGLED03 shows arrows and vacancy counts for three directions. It is intended for indoor junctions where drivers can choose between parking zones.

AC 220 V ±10%Supply voltage
RS485Communication

Features & configuration.

Parking installers and system integrators planning bay detection, controllers and vacancy displays.

Three directions at a junction

The SXK-PGLED03 shows arrows and vacancy counts for three directions. It is intended for indoor junctions where drivers can choose between parking zones.

Assign each direction

Send the junction plan and identify the zone for each arrow. Check the approach sightline and mounting space before selecting the sign location.

Assign three routes

Each arrow and vacancy count must correspond to the intended zone. Confirm the junction layout before configuring the display.

Check the approach sightline

Install the display where drivers can read all required directions. Review sign orientation and surrounding structures with the floor plan.

How it fits your project.

The single-direction display power value does not apply to the complete three-direction assembly. Confirm its electrical loading with the selected configuration.

  1. Detect the bay status
  2. Collect data by zone
  3. Process the parking counts
  4. Update signs and the parking map

Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.

Supplied system topology reference. Confirm actual device counts, branches and power loading for the ordered configuration.

Confirm before installation.

Send these details with your enquiry so we can review the equipment and configuration.

  • Number of bays and floor plans
  • Ceiling conditions and mounting positions
  • Controller groups, power and cable routes
  • Sign direction, zone mapping and software connection

Specs.

Details for equipment review and installation planning.

Device & construction

SXK-PGLED03 dimensions
1,410 × 183 × 56 mm

Operation & performance

Light source
High-brightness red and green LEDs
Display content
Available-space count and selectable directional arrows
Pixel pitch
4.75 mm
Reference display resolution
80 × 32 pixels per specified display module
LED drive
Constant current
Housing
Black aluminium frame with acrylic panel

Interfaces & integration

Communication
RS485; Bluetooth for commissioning
Communication distance
RS485 ≤300 m; Bluetooth ≤8 m

Power & environment

Supply voltage
AC 220 V ±10%
Operating environment
-30 to +75 °C; 5-95% RH

Technical reference: datasheet p. 9.

Applications.

Match the equipment to the site, the users and the access workflow.

Indoor parking bays

Mark the bays, mounting height and obstructions on the plan. Verify occupied and empty conditions after addressing the sensors.

Indoor parking guidance system illustration; sensor, controller and display configurations vary.

Multi-floor car parks

Define the floors, zones and cable routes before selecting controller groups. Match signs to the approved network structure.

Project planning example

Aisles and entrance signs

Place signs before driver decision points. Associate each arrow or displayed count with the correct zone.

Project planning example

Downloads.

Product documents for your technical review.

Before you order.

Questions about selection, integration and installation.

What is the SXK-PGLED03 Three-Direction Display used for?+

The SXK-PGLED03 shows arrows and vacancy counts for three directions. It is intended for indoor junctions where drivers can choose between parking zones.

How many devices are needed?+

Quantities depend on bay count, field devices, cable routes and controller topology. Send the floor plan and proposed sign positions for review.

Can we add another floor or zone?+

Review the downstream device counts, cabling and controller structure before expansion. The optional node layer is selected for the approved layout.

What is checked during commissioning?+

Assign device addresses, map sensors to bays and signs to zones. Verify occupied and vacant conditions, displayed counts and communication recovery.

What should I confirm before ordering SXK-PGLED03?+

Send the junction plan and identify the zone for each arrow. Check the approach sightline and mounting space before selecting the sign location.

How can you help with installation?+

We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.

Related equipment.

Let’s review your configuration.

Send the model, quantity and installation requirements. Include your layout or controller details where relevant.

Replies within 2 hours during Beijing business hours.

Chat on WhatsApp