SXK-PGLED21

Entrance Display

The SXK-PGLED21 shows available spaces before a driver enters the facility. The reference three-layer arrangement can show separate levels or zones.

AC 110-240 VSupply voltage
3 or 4 digits, according to configurationNumeric display
RS485Communication

Features & configuration.

Parking installers and system integrators planning bay detection, controllers and vacancy displays.

Availability at the entrance

The SXK-PGLED21 shows available spaces before a driver enters the facility. The reference three-layer arrangement can show separate levels or zones.

Choose the counts to display

Tell us whether you need one facility total or separate counts by floor or zone. Include the proposed mounting position and the direction of approaching vehicles.

Show availability before entry

Choose a facility total or separate floor and zone counts. The displayed information must match the way the guidance system divides the car park.

Confirm the entrance arrangement

The reference layout uses three display layers. Check the mounting location, driver approach and ordered display configuration together.

How it fits your project.

Shared system documentation covers several models. The values on this page refer to the named device; network distances depend on compliant cabling and the approved topology.

  1. Detect the bay status
  2. Collect data by zone
  3. Process the parking counts
  4. Update signs and the parking map

Functional sequence for configuration planning. Use the approved project drawing for physical wiring and installation.

Supplied system topology reference. Confirm actual device counts, branches and power loading for the ordered configuration.

Confirm before installation.

Send these details with your enquiry so we can review the equipment and configuration.

  • Number of bays and floor plans
  • Ceiling conditions and mounting positions
  • Controller groups, power and cable routes
  • Sign direction, zone mapping and software connection

Specs.

Details for equipment review and installation planning.

Device & construction

Enclosure materials
Spray-coated galvanised steel, white polycarbonate and acrylic panel
Reference dimensions
2,000 × 750 × 140 mm

Operation & performance

Reference configuration
Three display layers
Numeric display
3 or 4 digits, according to configuration
Light source
High-brightness red and green LEDs

Interfaces & integration

Communication
RS485
Communication distance
≤300 m

Power & environment

Supply voltage
AC 110-240 V
LED module voltage
DC 5 V
Power consumption
≤30 W per display layer
Operating temperature
-30 to +75 °C
Operating humidity
≤90% RH, non-condensing

Technical reference: datasheet p. 10.

Applications.

Match the equipment to the site, the users and the access workflow.

Indoor parking bays

Mark the bays, mounting height and obstructions on the plan. Verify occupied and empty conditions after addressing the sensors.

Indoor parking guidance system illustration; sensor, controller and display configurations vary.

Multi-floor car parks

Define the floors, zones and cable routes before selecting controller groups. Match signs to the approved network structure.

Project planning example

Aisles and entrance signs

Place signs before driver decision points. Associate each arrow or displayed count with the correct zone.

Project planning example

Downloads.

Product documents for your technical review.

Before you order.

Questions about selection, integration and installation.

What is the SXK-PGLED21 Entrance Display used for?+

The SXK-PGLED21 shows available spaces before a driver enters the facility. The reference three-layer arrangement can show separate levels or zones.

How many devices are needed?+

Quantities depend on bay count, field devices, cable routes and controller topology. Send the floor plan and proposed sign positions for review.

Can we add another floor or zone?+

Review the downstream device counts, cabling and controller structure before expansion. The optional node layer is selected for the approved layout.

What is checked during commissioning?+

Assign device addresses, map sensors to bays and signs to zones. Verify occupied and vacant conditions, displayed counts and communication recovery.

What should I confirm before ordering SXK-PGLED21?+

Tell us whether you need one facility total or separate counts by floor or zone. Include the proposed mounting position and the direction of approaching vehicles.

How can you help with installation?+

We provide remote video technical guidance, installation videos, wiring diagrams and installation instructions. For large projects, an engineer can provide on-site technical guidance.

Related equipment.

Let’s review your configuration.

Send the model, quantity and installation requirements. Include your layout or controller details where relevant.

Replies within 2 hours during Beijing business hours.

Chat on WhatsApp